Cable Stayed Bridge Feasibility Study
PROJECT: Feasibility Study of a Cable Stayed Bridge at Sreemangal.
Firm: Joint Venture of JDC, MDC & D8 Consultants Ltd. (D8CL).
CLIENT: Paragon Group
LOCATION: Sreemangal
PROJECT DESCRIPTION:
Main objective of this Cable Stayed Bride is to establish communication network between two parts of a valley at Sreemangal for developing a resort . Achieve safe and faster internal communication system in this area.
Project components of this Cable Stayed Bridge consists of the following:
i) Construction of Bridge – 650 meter
ii) Construction of approach road – 1.21 kilo meter
iii) Acquisition of Land – 1.46 Acre